Three Shear Fork Heavy Duty Electric Lifting Platform Lift Tables for Warehouse
Heavy duty design
Meet
EN1570 norm and
ANSI/ASME safety standard.
These models can be used in above-floor or in-floor pit applications.
Upper platform lifted with aluminum safety bar preventing descent on contact with obstructions.
Internal power pack equipped with relief valve against overloading and compensated flow valve for controlled lowering speed.
Heavy duty cylinders with drainage system and check valve to stop the lift table lowering in case of hose burst.
Safety clearance between scissors to prevent trapping during operation.
Self lubricating bushings on pivot points.
Removable lifting eye to facilitable handling and lift table installation.
Model |
|
HT1000 |
HT2000 |
Capacity |
Kg |
1000 |
2000 |
Lowered Height |
mm |
470 |
560 |
Raised Height |
mm |
3000 |
3000 |
Platform Size |
mm |
1700x1000 |
1700x1000 |
Base Frame Size |
mm |
1600x1000 |
1606x1010 |
Lift Time |
(sec) |
60-70
100 for w/o loading |
70-80
120 for w/o loading |
Power Pack |
|
380V/50HZ,AC2.2kw |
Net Weight |
kg |
450 |
750 |
Click on the pump station for safety and durability:
Equipped with overload protection device and safety valve, effectively preventing overload damage and load operation
Explosion proof valve design is safer:
The hydraulic system is equipped with a safety valve, which can prevent the platform vehicle from rapidly descending when the oil pipe bursts
Display Of Real Photography
Q: What about the quality of the products?
A: Our products are CE approved, and we have five inspection steps before shipment:
1. Inspect the raw material in accordance with ISO9001;
2. Strict inspection in the whole production process;
3. Load limit test when assembling finished;
4. 100% strict inspection of products before shipment;
5. If needed, inspection by buyer.
Q: How long is the quality guarantee?
A: All of our products carry one-year warranty.
Q: What's the leadtime?
A: Normally 30 days.
If you order more than 5 itmes mixed in one container, it will be 45 days.
If you order one item in one container, it will be 20 days.